Project Description
H&R Construction was selected as Construction Manager to assist in design, budgeting, and management of the construction of this 215,000 sq. ft. Cold Storage Distribution facility for Rich Products in conjunction with Cloverleaf Cold Storage in Crest Hill, IL. This project was completed in a 10-month time frame.
Features:
VSL Dock Levelers
Rite Hite Bi-Parting Freezer Doors
220,000 Sq. Ft. Paving
Ductil-Crete Floor System
FF50/FL35 Floor Flatness
Quell Fire Sprinkler
Eagleson Control System
Digital Lumens LED Lighting
24 Dock Positions
-10°F Freezer/40°F Coolers
260’ Elevated Bridge Connection to Production Plant
Project Details
Contract Type: General Contractor Design/Build
Project Type: New Construction
Size: 215,000 Sq. Ft.
Client Reference: Rich Products
Location: Crest Hill, IL